8.4 Commissioning
i
Before commissioning, a single safety inspection must
be done (use the "single safety inspection" form)
If the lift set up is done by a specialist (factory trained as-
sembler) then he can also do the safety inspection. If the
set up is done by the operating company then a specialist
must be tasked with the safety inspection.
The specialist confirms seamless operation of the lift on
the set up protocol for single safety inspection and releas-
es the lift for use.
i
After commissioning please complete the assembly
protocol and send to the manufacturer immediately.
8.5 Changing the assembly location
To change the assembly location the pre-conditions must
be met according to the assembly guidelines. The loca-
tion change is to be done according to the following se-
quence:
• Move the lift rails to about half height.
• Disconnect electrical supply lines to the lift from mains
power.
• Loosen cables between both columns.
• Remove the lifting arm (remove locking rings on the lift-
ing arm bolts,
• Pull out the lifting arm bolts and remove the lifting arm).
• Loosen the anchor fastenings.
• Carefully transport the lift column using appropriate
auxiliary means (e.g. crane, forklift, etc.) to the new
assembly location.
• Assemble the lift according to the procedure during as-
sembly and anchoring before first commissioning.
Use new anchors. The old anchors
are no longer fit for purpose.