Maintenance interval schedule
To guarantee constant, efficient and safe machine oper-
ation, ensure all the scheduled maintenance envisaged
Interval
Component
Dispenser
Every
work hour
Ploughshare
Structure for attaching to the three-
point hitch on a tractor
Every work day
Guards
Warning and hazard plates
Machine components
Every 50
hours of work
Nuts and bolts
Every 150
Tyres
hours of work
Nut and bolt tightness check
Check that the main fixing nuts and bolts are tight.
Cleaning the ploughshare
Clean the ploughshare to remove any debris, mud, peat,
plant residues etc that may have built up during use.
Lack of cleaning will limit the ejector range, therefore, as
well as affecting the machine's operation, it also causes
serious mechanical damage.
Proceed as outlined below.
1)
Lift the work vehicle off the ground.
2)
Secure the work vehicle in position (lifted off the
ground) with external means (trestles, etc.).
3)
Loosen the wing nut (A).
4)
Turn the lock lever (B).
5)
Push the share forwards and turn it so it is facing
downwards.
6)
Clean the ploughshare with the tool provided (C).
7)
Once the cleaning is complete, replace the plough-
share in the working position.
8)
Check that the Plant Control device (D) is inside the
share.
English language
MAINTENANCE INFORMATION
by the manufacturer is carried out.
Maintenance intervals
Type of work
Cleaning
Cleaning
Inspection
Integrity check
Integrity check
Greasing
Check of nuts and bolts
tightening torque
Check
Tighten loosened bolts to the correct tightening torque
(see "Nuts and bolts tightening torques chart").
UN41-0914UA
9)
Make sure that the share is secured in place with the
lock lever (B).
10) Tighten the wing bolt (A).
27
Manual reference
See "Cleaning the ploughshare"
See "Checking the structure of the three-
point hitch"
See "Guards"
See "Information and safety signs"
See "Lubrication points diagram"
See "Nut and bolt tightness check"
See "Tyre check"
D
C
7
B
A
Use and maintenance