Descargar Imprimir esta página

KNF Yamato RE212-G Manual De Instrucciones página 104

Rotavapor

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 258
3. PRE-OPERATION PROCEDURES
Installation Procedure
9. Installing cooling condenser and flask
Install glassware while slide panel is lifted up.
If slide panel springs up during setting, glass breakage and/or personal injury may result. Be
sure to hold down slide panel top when unlocking the jack.
Cooling condenser (type F)
Condenser insulation
Sample feed tube
Refill Valve
Cooling nozzle (OUT)
(black)
Cooling nozzle (IN)
(black)
Ball joint clamp
Standard: S35
Receiving flask 1 L
(1) Attach condenser bracket. (See P.17)
(2) Bring condenser flange into close contact
with vacuum seal in condenser housing and
tighten condenser nut clockwise to some
extent. Turn cooling condenser and the nut
simultaneously to re-tighten. Ensure that the
joint for receiving flask faces down.
(3) Slide condenser insulation over the
condenser.
(4) Pull out one end of condenser fixing band
from the buckle and put the condenser onto
condenser bracket. Pass the fixing band
through the buckle and pull on both sides to
fasten the condenser. (see right figure)
Vacuum nozzle (grey)
Condenser bracket
Condenser nut
Condenser fixing band
Condenser housing
Vapor Tube
(5) Attach receiving flask to the condenser with ball
joint clamp. Lock the clamp by turning a dial
inside.
(6) Put evaporation flask on Vapor Tube and
secure it with flask clip.
(7) Insert Refill Valve carefully into the condenser
so that sample feed tube does not become
bent or twisted.
18
Flask clip
Flask removal tool
Evaporation flask 1 L
Cooling condenser
type F (with insulation)
Condenser fixing
band
Buckle
DE
EN
FR
ES
IT

Publicidad

loading