Descargar Imprimir esta página

KNF Yamato RE212-G Manual De Instrucciones página 98

Rotavapor

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 258
3. PRE-OPERATION PROCEDURES
Installation Precautions
Connect the power supply of this unit to BM312-G (BO312-G).
The power cable attached to this unit is exclusively for BM312-G (BO312-G) connection.
When using it, connect it to BM312-G (BO312-G) and do not use any cable other than the
dedicated cable.
Install in a dry location.
Install unit where it will be free from
liquid spray and other moisture.
Failure to do so may result in control
mechanisms becoming wet, causing
malfunction, electric shock and/or fire.
Pay attention to the surroundings whenever operating jack.
Do not place any objects under the slide
panel. Such objects may cause damage
to unit or personal injury when using the
jack handle.
Always lower the slide panel slowly to
prevent damage to glassware on contact
with the bath
12
DE
EN
FR
ES
IT

Publicidad

loading