Descargar Imprimir esta página

KNF Yamato RE212-G Manual De Instrucciones página 128

Rotavapor

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 258
12. BC102-G Instruction manual
Operation Procedure
1. Starting operation
2. End of operation
①Immerse the flask of RE212-G in the water
chamber of BM312-G (BO312-G).
②Please close the lid.
③Always start operation at atmospheric pressure.
※ Follow the respective instruction manuals to
use RE212-G and BM312-G (BO312-G).
※ When opening and closing the lid, be careful
not to touch anything other than the handle
as the main unit may be hot.
①Stop operation of RE212.
②Open the lid of this unit.
③Please raise the flask.
※When lifting the BM312-G (BO312-G), be
careful not to forget to unplug the cable on
the back side. If you lift it while it is
connected, it may cause a fall and it is
dangerous.
42
DE
EN
FR
ES
IT

Publicidad

loading