Hoisting/Handling; Installation - SICE S 1000 Manual De Instrucciones

Ocultar thumbs Ver también para S 1000:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3. HOISTING/HANDLING

Before removing the machine from the pallet, make sure the items listed below have
been removed.
- box with equipment
- lift pedal unit
- front motor guard
- wheel clamping handle
Remove the screws that fasten the machine to the
pallet.
Use a suitable device to lift the machine, using the
appropriate bracket (see Fig. 4)

3.1. INSTALLATION

- Connect the lines of the lifter pedal unit, matching
the colour coded connections (Fig. 5a).
- Fasten the lift pedal unit to the tyre changer chassis
using the 2 provided screws (Fig. 5b).
- Position the wheel clamping handle in the provided
support (Fig. 5c).
- Fasten the front motor protection using the provided
116
CAUTION!
5b
4
5a
5c
User manual S 1000

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido