SICE S 1000 Manual De Instrucciones página 134

Ocultar thumbs Ver también para S 1000:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

8- Press the
the second bead is mounted (Fig. 23e - Fig. 23f).
Avoid personal injury. Make sure the top bead is correctly inserted in the rim well,
throughout the mounting stage.
9- Remove the bead pressing tool as well as the bead pressing tool clamps if used.
10-
Move the
position.
11- Move the tool holder head away from the work area by operating controls
Position the bead pressing tool in the correct
rest position so that it does not interfere with
the work area.
134
23d
pedal to start the rotation until
CAUTION!
lever downwards to bring the lower bead breaker disc to the rest
CAUTION!
23e
23f
and
User manual S 1000
.

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido