Mettler Toledo IND560x Manual De Instalación página 67

Ocultar thumbs Ver también para IND560x:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 93
3. Close jumpers W2 and W3 by placing the blue jumper pins across both pins of each jumper.
4. Align the IND560x-PAB to the installed standoffs and secure with four additional screws
5. Re-install the main board into the terminal front cover. Secure with original screws.
6. Reconnect the display cable to the main board.
64061929
|
11
|
07/2017
Figure 3-28: PAB Installed on IND560x Main Board
This sets each jumper to its ON position. Refer to the PCB Jumper Positions section later in this
document for confirmation on the appropriate jumper settings.
IMPORTANT: When the IND560x-PAB option board is installed, the mV/V jumper (W1) will
become inaccessible. Set the mV/V jumper correctly for the analog load cell system before
installing the IND560x-PAB.
provided in the IND560x-PAB kit.
METTLER TOLEDO IND560x Installation Manual
3-23

Publicidad

Tabla de contenido
loading

Tabla de contenido