Installing Cables And Connectors; Ferrite - Mettler Toledo IND560x Manual De Instalación

Ocultar thumbs Ver también para IND560x:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 93
5. The hardware to mount the terminal to the vertical surface is not included with the terminal – it
3.3.

Installing Cables and Connectors

Information for installing cables and connections to the IND560x terminal is provided in this
section, including:
3.3.1.

Ferrite

In order to meet certain electrical noise emission limits and to protect the IND560x from external
influences, it is necessary to install a ferrite core on the analog, IDNet and SICSpro load cell cable
of the harsh and panel enclosures. The ferrite core is included with the terminal.
To install the ferrite, after routing the load cell cable through the gland on the rear housing, insert
the cable through the center of the core and then take one wrap around the outside of the core and
route the cable through again. Either the complete cable or the individual wires can be wrapped
through the ferrite. This should be done as close to the enclosure as possible and on the inside of
the harsh enclosure. See Figure 3-14.
64061929
|
11
|
07/2017
must be supplied locally. Ensure that the mounting hardware is capable of supporting the
weight of the terminal, which is approximately 3.5 kg (8 lb). Using the locally supplied
hardware, mount the terminal to the vertical surface.
NOTE: Additional hardware is available for column mounting the IND560x terminal
Ferrite installation
Harsh Enclosure Cable Glands
Main Board Wiring Connections
Wiring Connections for Options
Figure 3-14: A Ferrite Core, Installed
METTLER TOLEDO IND560x Installation Manual
3-9

Publicidad

Tabla de contenido
loading

Tabla de contenido