Check Of The Circuit Separation - Amprobe MultiTest 2000 Manual De Usuario

Ocultar thumbs Ver también para MultiTest 2000:
Tabla de contenido

Publicidad

AMPROBE
16.2.

Check Of The Circuit Separation

PURPOSE OF THE TEST
The test, to be effected in case the protection is realized through separation (64-8/6
612.4, SELV or PELV or electrical separation), shall check that the insulation resistance
measured
according to the indications below (depending on the separation type)
complies with the limits reported in the table relative to the insulation measurements.
INSTALLATIONPARTS TO BE CHECKED
• SELV system (Safety Extra Low Voltage):
Measure the resistance between the active parts of the circuit under test
(separate) and the active parts of the other circuits.
Measure the resistance between the active parts of the circuit under test
(separate) and the earth.
The resistance shall not be lower than 0.25MΩ with a test voltage of 250VDC.
• PELV system (Protective Extra Low Voltage):
Measure the resistance between the active parts of the circuit under test
(separate) and the active parts of the other circuits.
The resistance shall not be lower than 0.25MΩ with a test voltage of 250VDC.
• Electrical separation:
Measure the resistance between the active parts of the circuit under test
(separate) and the active parts of the other circuits.
Measure the resistance between the active parts of the circuit under test
(separate) and the earth.
MULTITEST2000

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido