Reviewing The Valve Zone Conversion - Aventics PROFINET IO Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 235
108
AVENTICS | Bus Coupler AES/Valve Driver AV, PROFINET IO | R412018140–BAL–001–AG
Conversion of the Valve System
AES-
D-BC-
PNIO
UA
P
B
Fig. 18: Examples for impermissible configurations
A
A
B
AES-
D-BC-
PNIO
UA
P
12.5.4

Reviewing the valve zone conversion

Following the conversion of the valve zone, use the following checklist to determine whether you
have complied with all rules.
 Have you mounted at least 4 valve positions after the first pneumatic supply plate?
 Have you mounted a maximum of 64 valve positions?
 Have you integrated no more than 32 electrical components? Note that an AV-EP pressure
regulator corresponds to three electrical components.
 Have you mounted at least two valves after every pneumatic or electrical supply plate that marks
the start of a new section?
 Have you always installed the valve driver boards to be in line with the base plate limits, i.e.
– One base plate, 2x, is installed with one valve driver board, 2x,
– Two base plates, 2x, are installed with one valve driver board, 4x,
– One base plate, 3x, is installed with one valve driver board, 3x,
 Have you integrated no more than 8 AV-EPs?
If you have answered "Yes" to all these questions, you may proceed with the documentation and
configuration of the valve system.
P
UA
B
AES-
D-BC-
PNIO
UA
UA
P
UA

Publicidad

Tabla de contenido
loading

Tabla de contenido