Descargar Imprimir esta página

Bosch EPS 205 Manual Original página 14

Ocultar thumbs Ver también para EPS 205:

Publicidad

Idiomas disponibles

Idiomas disponibles

en
14 | EPS 205 | Product description
5.3
Prerequisites
5.3.1
Hardware
R
The workbench for the EPS 205 must have a load-
bearing capacity of >160 kg and a solid, torsion-
resistant, firm working surface. Use a spirit level to
make sure the working surface is horizontal.
R
To ensure adequate ventilation for the EPS 205, the
gap between the back of the unit and the wall must
be at least 30 centimeters. To prevent overheating,
it must be ensured that the vent grilles on the back
and underside of the EPS 205 are not closed off.
R
Never expose the EPS 205 to direct sunlight. There
should also not be any other sources of heat (for
example radiators) in the immediate vicinity of the
unit.
R
Compressed air connection with service unit for the
supply of dry, filtered, clean and oil-free compressed
air as per ISO 8573-1 with a pressure of between
0.5 MPa and 0.8 MPa.
R
The EPS 205 is only to be operated with test oil as
per ISO 4113.
!
Never fill the EPS 205 with diesel fuel.
!
The test oil in the tank must not drop below the oil
level indicator mark.
R
The EPS 205 must be placed in the oil collector pro-
vided. The oil collector should have a minimum size
of 30 x 570 x 720 mm (H x W x D). The maximum
height of the oil collector is 35 mm.
R
The EPS 205 is only to be connected to a grounded,
symmetrical three-phase AC network set to the local
voltage ±10% and with a frequency of 50/60 Hz. The
three-phase AC network must be protected by an
automatic circuit breaker.
i
We recommend using an external extractor with oil
mist separator for the spray pattern test.
i
Injectors with a coil resistance of up to 3 ohms can
be tested.
i
It is only permissible to connect printers approved
by Bosch.
5.3.2
Training
The EPS 205 is only to be operated by specialist per-
sonnel instructed and trained to perform diesel testing.
We recommend a user training course*
and repair of common rail injectors (CRI/CRIN) and
piezo common rail injectors (CRI Piezo).
User training at AA Training Center
*)
|
1 689 989 186
2017-10-27
5.4
Designation
EPS 205 basic unit (200 V)
Injector holder
Connection adapter with
adapter nuts M 12 / M 14
CRIN return adapter accessory set
Injection chamber
Inlet connector
2 O-rings 9.5 x 2
Hose (return)
Flushing drain
Hose 1.5 m
(for draining test oil tank)
Hose (injection)
Hose (return)
2 pens
Sealing plug
Recovery CD
EPS 200 system software CD
Adapter cable for CRI
Adapter cable for CRI
Adapter cable for CRI Piezo
Adapter cable for CRI Piezo
Adapter cable for CRIN
Oil collector
CD/DVD drive with power supply unit and
USB connecting cable (1 m)
Guard with
installation accessories
Hose (CRI Piezo return inlet)
Hose (CRI Piezo return outlet)
Inlet filter
Adapter for check valve
Oval head screw (6x) for securing left and
right side cover
Operating instructions
The additional O-rings are intended as spare parts for the inlet
1)
connector
on the testing
)
Scope of delivery
1)
Order number
1 685 200 162
1 687 023 640
1 687 016 038
1 682 312 053
1 683 386 166
1 680 210 143
1 680 712 360
1 680 712 293
1 680 712 283
1 680 712 362
1 680 712 287
1 683 083 004
1 683 370 038
1 687 005 116
1 687 005 050
1 684 465 841
1 684 465 842
1 684 465 674
1 684 465 676
1 684 465 843
1 685 411 077
1 687 023 846
1 685 510 241
1 685 510 239
1 680 703 078
1 680 703 079
1 687 434 067
1 683 350 904
2 910 641 152
1 689 989 186
Robert Bosch GmbH

Publicidad

loading