Descargar Imprimir esta página

Initial Testing; Start-Up; Maintenance; Disposal - Roger Technology H70/200AC Instrucciones Y Advertencias Para El Instalador

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 141
18

Initial testing

The testing must be performed by qualified technical personnel.
The installer is required to measure impact forces and select on the control unit the appropriate
speed and torque values to ensure that the motorised door or gate remains within the limits defined
by the standards EN 12453 and EN 12445.
Make sure that the provisions in Chapter 1 "GENERIC WARNINGS are observed.
• Turn on the power supply.
• Check that all connected controls are working correctly.
• Check travel and deceleration.
• Check that the impact force is correct, in compliance with EN 12453 and EN12445.
• Check that the safety devices are activated correctly
• Disconnect from mains power then reconnect.
• Starting with the gate stopped in an intermediate position, check that the position recovery procedure is
completed correctly for both the open and closed positions.
• Check the limit switch settings (if installed).
• Check that the release system works correctly.
19

Start-up

The installer is required to draw up and preserve the technical file of the system for at least 10 years, which must contain
the wiring diagram, the drawing and the photo of the system, the risk analysis and the solutions adopted, the manufacturer's
declaration of conformity for all connected devices, the instructions manual of each device and / or accessory and the
system's maintenance plan.
Apply a plate indicating the automation system data on the motorised door or gate, the name of the person in charge of the
start-up, the serial number and the year of construction, as well as the CE mark.
Apply a plate and / or label with the indications for the operations required to manually unlock the system.
Draw up and provide the end user with the declaration of conformity, instructions and warnings for use and the maintenance
plan.
Make sure that the end user has understood the correct automatic, manual or emergency operation of the system.
Inform the end user about the dangers and risks that may be presen
20

Maintenance

Perform scheduled maintenance every 6 months.
Check cleanliness and function.
If the unit contains dirt, moisture, insects or other foreign matter, disconnect from mains power and clean the board and the
housing.
Repeat the initial installation test procedure after cleaning.
If any corrosion is found on the printed circuit board, evaluate if it is necessary to replace the board itself.
21

Disposal

The product may only be uninstalled by qualified technical personnel, following suitable
procedures for removing the product correctly and safely. This product consists of numerous
different materials. Some of these materials may be recycled, while others must be
disposed of correctly at the specific recycling or waste management facilities indicated by
local legislation applicable for this category of product.
Do not dispose of this product as domestic refuse. Observe local legislation for
differentiated refuse collection, or hand the product over to the vendor when purchasing an
equivalent new product.
Local legislation may envisage severe fines for the incorrect disposal of this product.
Warning! Some parts of this product may contain substances that are harmful to the environment
or dangerous and which may cause damage to the environment or health risks if disposed of
incorrectly.
76

Publicidad

loading