6. TYPE OF INSTALLATION
1. DESCRIZIONE DEI COMPONENTI
6.4 DIAGRAM 4
HYDRAULIC CONNECTION
MIRAI-SMI with FEBOS-CRONO and Eco Hydro Kit: Floor Heating
and Cooling, DHW Production with MIRAI-SMI and Eco Hydro Kit.
INTEGRATION boiler.
Recipe 13: C400=13
C407=1 (default)
C410=37
C903=-20.0 (default, do not modify)
C906=1.00 (default, do not modify)
Legend
1. MIRAI-SMI
2. Eco Hydro Kit
3. FEBOS-CRONO
4. FEBOS-ENERGY
5. MIRAI-SMI electricity meter
6. ESD25IX dehumidifier
7. Electrothermal head Normally Closed
8. etiKa Evo boiler
9. Support relay
ATTENTION:
The system must be built in compli-
ance with the relative project and in
compliance with the regulations in
force in the place of installation.
It is absolutely forbidden to pass
signal and data transmission cables
together with power cables with
voltages> 50 V.
SIGNAL CABLE (<24V): BUS-SCS cable consisting of 2 flexible conductors, with a cross-section of 0.50 mm
DATA TRANSMISSION CABLE (RS-485): 1 X 2 X AWG 24 FLEX S(FTP) LSZH RS485 MODBUS serial bus cables for Canbus and Modbus applications.
Belden type 14S7KVZ or equivalent. The shield must be grounded at one end of the cable only.
CONTROL CABLE (230 V):
5
9
1
Electric cable with section 1.5 mm
8
2
.
EN
EN
4
3
7
6
2
2
, twisted with sheath and unshielded.
113