REMS Multi-Push SL Instrucciones De Servicio página 23

Ocultar thumbs Ver también para Multi-Push SL:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 50
eng
3.4.1. Pressure test with water, test method A (EN 806-4:2010, 6.1.3.2)
Program sequence ↑ ↓ (8):
1. Test \ Enter
2. Test with water \ Enter
3. Test with water A \ Enter
4. Check reference test pressure default (p refer) and change if necessary
(11) \ ↓
5.  Check stabilisation default (t stabi) and change if necessary (11) \ ↓
6.  Check test time default (t test) and change if necessary (11) \ ↓
7. Actual test pressure (p actual) is adjusted to reference test pressure (p
refer) \ Enter
8. Stabilisation/wait time (t stabi) running, actual test pressure (p actual) is
changed to reference test pressure (p refer) on expiring. The stabilisation/
wait time can be ended prematurely with Enter, the test time (t test) begins
immediately (\ Esc = cancel).
9. Display screen: Reference test pressure (p refer), actual test pressure (p
actual), differential test pressure (p diff), test time (t test) \ Enter
10. Esc >> Start menu \ Memory Manager, data transfer >> 3.6
3.4.2. Pressure test with water, test method Δ>10K (B/1): Temperature
compensation (EN 806-4:2010, 6.1.3.3)
Program sequence ↑ ↓ (8):
1. Test \ Enter
2. Test with water \ Enter
3. Test with water B \ Enter
4. Test Δ>10K (B/1) \ Enter
5. Check reference test pressure default (p refer) and change if necessary
(11) \ ↓
6.  Check stabilisation default (t stabi) and change if necessary (11) \ ↓
7.  Check test time default (t test) and change if necessary (11) \ ↓
8. Actual test pressure (p actual) is adjusted to reference test pressure (p
refer) \ Enter
9. Stabilisation/wait time (t stabi) running, actual test pressure (p actual) is
changed to reference test pressure (p refer) on expiring. The stabilisation/
wait time can be ended prematurely with Enter, test time (t test) \ Enter (\
Esc = cancel).
10. Display screen: Reference test pressure (p refer), actual test pressure (p
actual), differential test pressure (p diff), test time (t test) \ Enter
11. Esc >> Start menu \ Memory Manager, data transfer >> 3.6
3.4.3. Pressure test with water, test method PfS (B/2): Press connections
unpressed leaking (information leaflet "Leak tests of drinking water installations
with compressed air, inert gas or water" (January 2011) of the German Central
Association for Sanitary, Heating and Air Conditioning (ZVSHK), supplement
to EN 806-4:2010, 6.1.3.2,)
Program sequence ↑ ↓ (8):
1. Test \ Enter
2. Test with water \ Enter
3. Test with water B \ Enter
4. Test PfS (B/2) \ Enter
5. Check reference test pressure default (p refer) and change if necessary
(11) \ ↓
6.  Check test time default (t test) and change if necessary (11) \ ↓
7. Actual test pressure (p actual) is adjusted to reference test pressure (p
refer) \ Enter, test time (t test) begins immediately (\ Esc = cancel)
8. Display screen: Reference test pressure (p refer), actual test pressure (p
actual), differential test pressure (p diff), test time (t test) \ Enter
9. Esc >> Start menu \ Memory Manager, data transfer >> 3.6
3.4.4. Pressure test with water, test method P+M (B/3): Plastic and metal pipe
systems (EN 806-4:2010, 6.1.3.3 and information leaflet "Leak tests of drinking
water installations with compressed air, inert gas or water" (January 2011) of
the German Central Association for Sanitary, Heating and Air Conditioning
(ZVSHK).
Program sequence ↑ ↓ (8):
1. Test \ Enter
2. Test with water \ Enter
3. Test with water B \ Enter
4. Test P+M (B/3) \ Enter
5. Check reference test pressure default (p1 refer) and change if necessary
(11) \ ↓
6. Check reference test pressure default (p2 refer) and change if necessary
(11) \ ↓
7.  Check test time default (t1 test) and change if necessary (11) \ ↓
8.  Check test time default (t2 test) and change if necessary (11) \ ↓
9. Actual test pressure (p1 actual) is adjusted to reference test pressure (p1
refer) \ Enter, test time (t1 test) begins immediately (\ Esc = cancel)
10. Actual test pressure (p2 actual) is adjusted to reference test pressure (p2
refer) \ Enter, test time (t2 test) begins immediately (\ Esc = cancel)
11. Display screen: Reference test pressure (p1 refer), actual test pressure
(p1 actual), differential test pressure (p1 diff), test time (t1 test)
Reference test pressure (p2 refer), actual test pressure (p2 actual), differ-
ential test pressure (p2 diff), test time (t2 test) \ Enter
12. Esc >> Start menu \ Memory Manager, data transfer >> 3.6
3.4.5. Pressure test with water, test method C (EN 806-4:2010, 6.1.3.4)
Program sequence ↑ ↓ (8):
1. Test \ Enter
2. Test with water \ Enter
3. Test with water C \ Enter
4. Check reference test pressure default (p refer) and change if necessary
(11) \ ↓
5.  Check stabilisation default (t0 stabi) and change if necessary (11) \ ↓
6.  Check test time default (t1 test) and change if necessary (11) \ ↓
7. Check test time default (t2 test) and change if necessary (11) \ Enter
8. Actual test pressure (p0 actual) is adjusted to reference test pressure (p
refer) \ Enter
9. Stabilisation/wait time (t stabi) running, actual test pressure (p actual) is
changed to reference test pressure (p refer) on expiring. The stabilisation/
wait time can be ended prematurely with Enter, the test time (t1 test) begins
immediately followed by test time (t2 test) (\ Esc = cancel).
10. Display screen: Reference test pressure (p refer), actual test pressure (p0
actual), differential test pressure (p0 diff), test time (t0 test)
Actual test pressure (p1 actual), differential test pressure (p1 diff), test time
(t1 test) actual test pressure (p2 actual), differential test pressure (p2 diff),
test time (t2 test) \ Enter
11. Esc >> Start menu \ Memory Manager, data transfer >> 3.6
3.5. Compressed air pump program
The pressure is displayed and controlled to the reference test pressure (p refer)
selected on the screen in the range from 200 to 0 descending in hPa (mbar,
psi) and in the range from 0.2 to 8.0 ascending in MPa (bar, psi).
Program sequence ↑ ↓ (8):
1. Compressed air pump \ Enter
2. Check reference test pressure default (p refer) and change if necessary
(11) \ Enter
3. The vessel is pumped up to the reference test pressure (p refer).
4. Esc >> Start menu \ Memory Manager, data transfer >> 3.6
The pressure of a vessel that is already under pressure is specified as p actual 
after connecting the vessel.
The program can be aborted at any time with the Esc button (10). Then all the
valves open and the pressure is released. The pump-up is saved but "Cancel"
is shown in the file.
3.6. Memory Manager, data transfer, logging
Four functions are provided for memory management:
●  Display saved results of the flushing and testing programs 
●  Print saved results of the flushing and test programs on a printer. Plug the 
USB lead (Fig. 9 (42)) into the USB port (Fig. 2 (33)).
●  Delete saved results of the flushing and testing programs 
●  Save results of the flushing and test programs on a USB stick. Plug in the 
USB stick at the USB port (Fig. 2 (33)).
Display / Pressure
Customer:
Delete file no.
Delete all files
REMS Multi-Push
Save USB
Date:
Hour:
File-No.
Test with water A
p prefer
p actual
p diff
t test
Tester:
The results of the flushing and test programs are saved with date, time and log
number in the selected language and can be transferred to a USB stick or
printer (accessory part no. 115604) (neither of which is included in the scope
of supply) for documentation. Necessary additions to saved data, e.g. customer
name, project number, tester, are possible on external devices (e.g. PC, laptop,
tablet PC, smartphone). Paper roll, pack of 5, for printer (Art. No. 090015).
Insert the paper roll and charge the battery before using the printer (Fig. 9 (40)).
If the printer is charged without the paper roll inserted, the LED (41) flashes 
repeatedly 3 times. Push back the paper compartment rail (42) to open the
paper roll compartment. Insert the paper roll so that its end is transported from
below. Close the paper compartment. Keep the button (43) pressed for manual
paper feed. Connect the charger (44) and USB lead (45) to the printer and
charge the printer. To print stored results of the flushing and test programs, 
plug the USB lead (45) into the USB port (Fig. 2 (33)). After selecting the memory
manager, press Enter, the printer switches on automatically. Select the Display/
Print menu item, select the file no. Press Enter to print the data shown on the 
screen. Switch off the printer (43) and unplug the USB lead. The following
printer functions are indicated with the LED (41).
LED flashes repeatedly once: printer ready for operation.
LED flashes repeatedly twice: overheating
LED flashes repeatedly 3 times: low paper
LED flashes repeatedly 4 times: unsuitable charger
28.05.2014
13 :22
000051
bar
11.3
bar
11.3
bar
0.0
min
002 : 00
eng
23

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Multi-push slw

Tabla de contenido