Set Up For Next Operation; End Of Operating Day - Johnson & Johnson DePuy Synthes FMS VUE II Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 73
5.8

Set Up for Next Operation

To set up for the next operation, install a new Intermediary tube as described in Section 5 .2 .
WARNING! The Inflow Tubing (Ref. 284508) can be left in place at the end of
the previous operation only with the Intermediary Tube with One-Way Valve
(Ref. 281142 or 284649) attached.
WARNING! Carefully follow setup and changing procedures to ensure sterility.
The Intermediary Tube with One-Way Valve Ref. 281142 must remain attached to
the Inflow Tubing, which ensures sterility between procedures.
5.9

End of Operating Day

At the end of the operating day, remove and discard all tubing according to approved hospital
procedures . Turn off the pump .
To end operation:
1 . Close the clamp under the pressure chamber . When another
surgery is scheduled for the same operating day, leave the
Inflow Tubing .
2 . Disconnect the blue luer-lock of the Inflow tube below the One-
Way Valve .
3 . Press the blue FLOW+ button on the 5-Way Foot Pedal to empty
the patient joint (optional) .
4 . Rotate the Pinch Valve to the vertical position to release the tube .
5 . Remove the
orange
hospital regulations .
1 . STERILE OPERATOR: Check that the luer-lock is properly
tightened, and pass the blue end to a non-sterile operator .
2 . NON-STERILE OPERATOR: Disconnect the used One-Way Valve
and immediately connect the new Intermediary Tube with the
One-Way Valve .
suction tubing and discard according to
30

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido