To Prepare The Truck For Operation - Jungheinrich EKS 314 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

t To prepare the truck for operation
2.2
– Attach the belt system
(see section "Attaching the safety restraint belt" in this chapter).
– Close the safety gates securely on both sides.
– Turn the EMERGENCY DISCONNECT switch (5) to release it.
– Put the key in the key switch (3) and turn it clockwise.
– Test the warning device (horn) (4).
– Test the operating and parking brakes.
– Carry out a test movement on the lift mast to adjust the height display.
Qw W
Press the EMERGENCY DISCONNECT switch (5) immediately if the truck
starts to move or lift when it is switched on.
NOTICE
Brief steering movements caused by steering referencing are permissible.
7
8
6
5
4
3
E 9

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido