Connection Assignment; Connecting To Extractor System - Hettich BlueMax Mini Modular Instrucciones De Servicio

Ocultar thumbs Ver también para BlueMax Mini Modular:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 278
Start up / trial run

Connection assignment

No.
Designation
1
Connection 1
2
Connection 2
3
Connection valve for foot switch
4
Connection 4
en
Remove dummy plug
5
compressed air hose to connector on foot switch.
Note!
Always carry out a function test after completing this
work.
Warning!
The compressed air hoses must not be damaged or
kinked.
Be sure to follow the assembly instructions in the appendix
to this operating manual.

9. Connecting to extractor system

Connect the machine to an extractor system. It is compulsory
to use a flexible, fire-retardant hose for connection to an
extractor system.
Fit the extractor system's extraction hose to suction
connector
and secure this in place with a hose clamp.
1
The extractor system must have an airflow rate of
at least 20 m/s.
Extraction hose diameter: ø 80 mm. Route extraction hose
so as not to exert strain on the suction connector!
130
from distributor and connect
3
4
1
2
5
1

Publicidad

Tabla de contenido
loading

Tabla de contenido