Nogueira FTN-1900 Manual De Instrucciones página 228

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Operation
Fit the inverter tool (G) to the gearbox
7.
shaft end;
Using your hands, turn the inverter tool in
8.
the direction shown in the illustration. The
feeding rollers will rotate in the opposite
direction to the working direction,
expelling (throwing out) accumulated
material into the platform. Rotate until
all material is removed;
After the "unclogging", remove the
9.
inverter tool (G) and store it;
Lower the protective cover (F);
10.
Fit the bolt, the two flat washers and the
11.
nut (E).
88
G
Instructions Manual
F
E

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido