3. Receiving the product
3.1 Delivery
The pumps are tested 100 % before leaving the
factory. The test includes a function test where the
pump performance is measured to ensure that the
pump meets the requirements of relevant standards.
Test certificates are available from Grundfos.
3.2 Transporting the product
Always transport the pump in the specified position.
During transport, the pump must be fastened
securely to prevent damage to the shaft and shaft
seal caused by excessive vibrations and knocks. Do
not lift the pump by means of the shaft.
Warning
Pay attention to the pump weight, and take
precautions to prevent personal injury if
the pump should topple or fall by accident.
3.3 Handling the product
Weight: See label on the packing.
Warning
Motors from 4 kW and up are supplied with
lifting eyes which must not be used for
lifting the entire pump unit. See fig. 4.
Lift the pumps by means of nylon straps and
shackles or a hook as shown on figs
Fig. 1
Correct lifting of pump without base
frame
6
Fig. 2
1
to 3.
Fig. 3
Fig. 4
Correct lifting of pump with base frame
Correct lifting of pump without motor
Incorrect lifting of pump