Vercise™ Deep Brain Stimulation Systems
Intraoperative Testing
Intraoperative testing may be performed using the External Trial Stimulator (ETS) and the
appropriate OR Cable. See the "DBS Product Compatibility" section of this manual. Refer to the
appropriate Programming Manual as listed in the DBS Reference Guide for detailed stimulation
procedures and guidelines.
Caution: Do not immerse the OR Cable Connector or plug in water or other liquids. The OR
Cable is intended for single use only; do not resterilize.
Intraoperative Testing Using ETS 3 and 8 Contact Push‑Button OR Cables
(DB‑5170 with DB‑4120‑08)
1. Ensure that ETS 3 is off by checking the Stim Indicator light
Always turn the ETS 3 off before connecting or disconnecting the OR Cable
Warning:
assemblies to prevent unexpected stimulation.
2. Connect the proximal end of the OR Cable Extension to the ETS 3 Port labeled "L" while
keeping the distal end of the OR cable within the sterile field (Figure 11).
If two DBS Leads are being tested simultaneously, connect the left DBS Lead to Port L and the
right DBS Lead to Port R.
Surgical Implant Manual
92495783-02
Page 28 of 1157
Figure 11. Connecting the OR Cable to ETS 3
on the ETS.