Intraoperative Testing Using the ETS 2, the ETS Adapter, and 1x8 OR
Cables and Extension
1. Attach the OR Cable Extension to the OR Cable (Figure 14).
2. Ensure that ETS 2 is off by checking the Stim Indicator light
Warning:
Always turn the ETS 2 off before connecting or disconnecting the OR Cable
assemblies to prevent unexpected stimulation.
3. Plug the ETS Adapter into the ETS 2 Port labeled "CD" (Figure 15).
Figure 15. Connection of the ETS Adapter to the ETS 2
4. Plug the OR Cable with Extension into the ETS Adapter Port labeled "1-L" (Figure 16).
If two DBS Leads are being tested simultaneously, connect the left DBS Lead to Port 1-L and
the right DBS Lead to Port 2-R.
Figure 16. Connection of the 1x8 OR Cable to ETS 2 and ETS Adapter
5. Check that the locking lever on the OR Cable Connector is in the open (0) position.
Figure 14. 1x8 OR Cables and Extension
Implanting the DBS System
on the ETS.
Surgical Implant Manual
92495783-02
Page 31 of 1157