Installation: Pointek Cls200 Standard; Handling Precautions - Siemens POINTEK CLS200 Manual De Arranque Rápido

Ocultar thumbs Ver también para POINTEK CLS200:
Tabla de contenido

Publicidad

Installation: Pointek CLS200 Standard

Notes:
• Installation shall only be performed by qualified personnel and in accordance with
local governing regulations.
• This product is susceptible to electrostatic shock. Follow proper grounding
procedures.
• The housing may only be opened for maintenance, local operation, or electrical
installation.
• Before installing the instrument, verify that the environment complies with any
restrictions specified on the product nameplate.
• To ensure compliance with CE EMC regulations, please install in accordance with
the testing details on page 10.

Handling Precautions

WARNING: To prevent damage, all CLS200 Standard units with a rod
longer than 2 m (6.5 ft) must be handled as described below.
When lifting CLS200 from a horizontal position, support it at these three points:
At the end of the rod
before the sensor
Once vertical, CLS200 may be held by the process
connection or flange:
Note: Unit shown is CLS200 Standard Extended Rod
Version. Handling precautions apply to all CLS200
Standard units with rods longer than 2 m (6.5 ft).
Page 12
Pointek CLS200/300 Standard – OPERATING INSTRUCTIONS
Midway along
the rod
At the process
connection or flange
At the process
connection or flange
7ML19985JH04

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pointek cls300

Tabla de contenido