17. Emergency operation (only 11-22 kW)
Warning
Never make any connections in the pump terminal
box unless all electric supply circuits have been
switched off for at least 5 minutes.
Note for instance that the signal relay may be
connected to an external supply which is still
connected when the mains supply is disconnected.
If the pump has stopped and it does not restart after you have
gone through normal remedies, the reason could be a faulty
frequency converter. If this is the case, it is possible to establish
emergency operation of the pump.
But before you change to emergency operation, we recommend
you to check these points:
•
Check that the mains supply is OK.
•
Check that control signals are working (start/stop signals).
•
Check that all alarms have been reset.
•
Make a resistance test on the motor windings (disconnect the
motor conductors from the terminal box).
If the pump still does not start, the frequency converter is faulty.
To establish emergency operation, proceed as follows:
1. Disconnect the three mains conductors, L1, L2, L3, from the
terminal box, but leave the protective earth conductor(s) in
position on the PE terminal(s).
Fig. 39 Disconnecting the mains conductors
2. Disconnect the motor supply conductors, U/W1, V/U1, W/V1,
from the terminal box.
Fig. 40 Disconnecting the motor supply conductors
3. Connect the conductors as shown in fig. 41.
Fig. 41 How to switch an E-pump from normal operation to
emergency operation
Use the screws from the mains terminals and the nuts from the
motor terminals.
Fig. 42 Connecting the conductors
4. Insulate the three conductors from each other by means of
insulating tape or the like.
Fig. 43 Insulating the conductors
Fig. 44 Insulated conductors
Warning
Do not bypass the frequency converter by connecting
the mains conductors to the U, V and W terminals.
This may cause hazardous situations for the staff as
the high voltage potential of the mains may be
transferred to touchable components in the terminal
box.
Check the direction of rotation when starting up after
Caution
switching to emergency operation.