Festo MPS 400 Serie Instrucciones De Utilizacion página 31

Estación de unión
Ocultar thumbs Ver también para MPS 400 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Work order "do not mount cap on workpiece and feed to next station"
5. Based on the work order string, the PLC program detects that the cap mounting stage needs to be
skipped for this workpiece.
6. The deflector is activated.
7. Since no cap is required for this workpiece, the deflector is retracted again.
8. The stopper advances again.
9. The workpiece is detected at the end of the first conveyor. If a downstream station is ready (I6=1), the
workpiece is transported to the downstream station.
10. Joining station conveyor motor off.
11. Workpiece in downstream station
Work order "mount cap on workpiece"
5. Based on the work order string, the PLC program detects that a cap needs to be mounted on this
workpiece.
6. The deflector is activated.
7. The workpiece is stopped at the deflector.
8. The stopper advances again.
9. Joining station conveyor motor off.
10. A cap is detected at the end of the second conveyor.
11. Second conveyor motor on.
12. A cap is detected at the start of the second conveyor.
13. Second conveyor motor off.
14. The Pick&Place module suction grips the cap.
15. The Pick&Place module joins the cap and the workpiece.
16. The Pick&Place module returns to its initial position.
17. The deflector is retracted.
18. Joining station conveyor motor on.
19. The workpiece is detected at the end of the first conveyor.
20. If a downstream station is ready (I6=1), the workpiece is transported to the downstream station.
21. Joining station conveyor motor off.
22. Workpiece in downstream station.
© Festo Didactic 8122168
Joining station – Operating instructions
31

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

8129125

Tabla de contenido