Commissioning; General Information On The Use Of Mps Stations; Technical Equipment Of The Workstation - Festo MPS 400 Serie Instrucciones De Utilizacion

Estación de unión
Ocultar thumbs Ver también para MPS 400 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

12 Commissioning

12.1 General information on the use of MPS Stations

MPS stations are generally shipped:
Fully assembled
Individually adjusted and ready for use
Pre-commissioned
Tested
When stations are combined, the mechanical setup as well as sensor positions and
settings may have to be changed.
Commissioning is normally limited to visual inspection in order to ensure correct tubing connections, wiring
and operating voltage supply.
All components, tubing connections and cabling are clearly identified so that all of the connections can be
readily restored as required.

12.2 Technical equipment of the workstation

You'll need the following in order to commission the MPS station with the sample programs:
The assembled and adjusted MPS station
A control console
A PLC board with 16 digital inputs and outputs
A power supply unit: 24 V DC, 4 A, ≤ 100 W output power, SELV/PELC limited power source (LPS)
Compressed air supply: 600 kPa (6 bar)
A PC with installed PLC programming software
Two I/O cables (SysLink)
© Festo Didactic 8122168
Joining station – Operating instructions
33

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

8129125

Tabla de contenido