Introductory User Manual
Required Laboratory Infrastructure
The following table contains an overview of the infrastructure and connections required for your
S8 TIGER. In-depth description of the connection details are given later in this manual.
Tab. 1-1:
S8 TIGER laboratory infrastructure and connections
Configuration
Utilities:
Electricity
Water
Compressed air
Gas connections:
He or N
2
P-10 or P-5 (Ar:CH
)
4
Data lines:
Ethernet jack
Telephone jack
1-4
S8-1kW
required
not required
not required
for liquid or loose powder samples
if flow counter is installed
network configuration 3 or 4
for enhanced Bruker AXS support
S8 TIGER X-ray Spectrometer
S8-3kW/4kW
required
required or chiller
not required
DOC-M80-ZXX031 V4 – 02.2010