Pre-Installation; Mains Connection And Grounding - Bruker S8 TIGER Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

S8 TIGER X-ray Spectrometer

Pre-Installation

Mains Connection and Grounding

Tab. 1-5:
Electrical requirements (including X-ray generator and control electronics, not including
accessories)
Device
Power consumption
Mains voltage and frequency
(standard configuration)
Note
Power consumption of the optional external devices (water chiller, host PC, etc.) is not
included in table 1-5. (Refer to the technical specifications for the specific device(s) being
installed at your site.)
The S8 TIGER is shipped with a 7 m (23') long power cable (5 x 6 mm
plug connector ready to be connected to a three-phase AC network. Alternatively, the cable may be
connected directly to the switchboard of the in-house mains system.
The instrument's connection to the in-house network must be protected with fuses or automatic circuit
breakers for all phases. It must be possible to disconnect the system completely from the power sup-
ply using either:
ƒ
a labeled switch; or
ƒ
a labeled automatic circuit-breaker located near the spectrometer.
The fuses or circuit breakers should be easily accessible.
DOC-M80-ZXX031 V4 – 02.2010
S8-1kW
2.9 kVA
208 - 230 V, 50/60 Hz, 16 A
1-phase
Introductory User Manual
S8-3kW/4kW
5.2 / 7 kVA
208 - 230 V (50/60 Hz) 40 A
1-phase
208 - 230 V (50/60 Hz) 32 A
3-phase
2
) with an approved CEE form
1-7

Publicidad

Tabla de contenido
loading

Productos relacionados para Bruker S8 TIGER

Tabla de contenido