Before The Final Instrument Installation - Bruker S8 TIGER Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

S8 TIGER X-ray Spectrometer

Before the Final Instrument Installation

The completion of the described installation preparation must be executed by the customer. After this
is done, an installation date will be arranged. Bruker AXS Customer Support will finish the installation
of the S8 TIGER only after the customer has confirmed that the preparation is finished.
Note
Please check that the instrument can be transported from the loading dock to the labora-
tory. The larger package for the 3/4 kW version measures 120 cm x 132 cm x 160 cm
(D x W x H) and has a mass of about 510 kg (1 kW version: 120 cm x 110 cm x 160 cm;
490 kg).
Warning
When moving the S8 TIGER be aware of your feet concerning moving of the rollers.
Move the S8 TIGER with caution for example on a ramp, concerning to tilting danger.
DOC-M80-ZXX031 V4 – 02.2010
Introductory User Manual
1-29

Publicidad

Tabla de contenido
loading

Productos relacionados para Bruker S8 TIGER

Tabla de contenido