Bruker S8 TIGER Manual De Instrucciones página 44

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Introductory User Manual
Tab. 1-13:
Installation Checklist
Component
Room Location and Environment
Floor can support the S8 TIGER
Floor space for S8 TIGER free of equipment and clean
Have minimum clearance behind unit
Doors and hallways from loading dock to location have
adequate clearance for moving the S8 TIGER in its ship-
ping crate; freight elevator available
Environmental considerations met
Internal Cooling Water
Distilled water for S8 is available
Communications
Modem line (near instrument) or internet access for re-
mote diagnostics via web ex.
Second voice line (near computer)
Ethernet network connection from S8 TIGER to computer
Electrical Power available:
For S8 TIGER
For computer and/or peripherals
For the water chiller (if installed)
Check that electrical power is reliable and within toler-
ances (see Reference), if not get USP
1-30
S8 TIGER X-ray Spectrometer
YES/NO
Value/remark
DOC-M80-ZXX031 V4 – 02.2010

Publicidad

Tabla de contenido
loading

Productos relacionados para Bruker S8 TIGER

Tabla de contenido