4.6.10 Installation with option TE1 "extended tower
length"
1
Fig. 16: Installation at T
medium
1 Insulation
With option TE1 "extended tower length", the flowmeter
sensor may be insulated as shown in Fig. 16.
-50°... 200 (-58 ... 392 °F)

4.6.11 Notes about EHEDG conformity

WARNING – Risk of poisoning!
Bacteria and chemical substances can
contaminate or pollute pipeline systems and the
1
materials they are made of.
Observe the following instructions in installations
conforming to EHEDG requirements.
— The appropriate installation conditions must be observed in
order to achieve an installation that complies with EHEDG
requirements.
— In order to achieve compliance with EHEDG requirements,
the combination of process connection and gaskets
selected by the operator must consist solely of EHEDG-
compliant parts. Note the information in the latest version of
the following document:
G10068
EHEDG Position Paper: "Hygienic process connections to
use with hygienic components and equipment".
All weld stub combinations available from ABB are approved
for use.
The threaded pipe connection conforming to DIN11851 has
been approved for use together with a process gasket
accepted by the EHEDG (one made by Siersema, for
example).
CoriolisMaster FCB330, FCB350 | CI/FCB300-X1 Rev. C EN - 19

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Coriolismaster fcb330Coriolismaster fcb350

Tabla de contenido