Descargar Imprimir esta página

Beta 1899SI Manual De Uso E Instrucciones página 21

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 58
OPERATION MANUAL AND INSTRUCTIONS
ISTRUZIONI PER L'USO
7. The second setting (stand-by time) from a minimum of 5 seconds to a maximum of 90 seconds and press OK
8. Indicatively, the initial on misting time will be:
8.1. - 1 s for extremely clogged or small-displacement vehicles
8.2 - 2 s for vehicles with a normal level of clogging or medium/large displacement
9. The stand-by time between the recommended sprinkling stages is minimum 10 s. In the case of problems linked to engine
knocking or hydrolocking, phenomena that can result in engine shut-down or anomalous engine knocking, the time must be
increased until these problems disappear.
10. After setting the sprinkling times, insert the sprinkler in the AIR tank to start the CALIBRATION/PRIMING procedure and
press OK. This operation is necessary to pressurise the machine's circuit.
11. The CALIBRATION procedure will last around one minute. At the end of this time the following screen will appear
12. Position the sprinkler on the intake manifold: WARNING, always position it after the turbo or intercooler (this is important
in order to avoid damage to the turbo or intercooler). Where present, disconnect the air flow mass sensor.
13. Press OK to start the treatment
14. Keep the engine between 1100 rpm and max 1500 rpm
EN
I
21

Publicidad

loading