Descargar Imprimir esta página

Beta 1899SI Manual De Uso E Instrucciones página 25

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 58
OPERATION MANUAL AND INSTRUCTIONS
ISTRUZIONI PER L'USO
4. Connect the sprinkler adapter pipe at the outlet to the inlet of the LPG injector ramp and ensure that it is completely tightened
to prevent leakages of the cleaning fluid and LPG.
5. Connect the machine to the vehicle's battery (12 V dc): the black clamp to the negative pole (-) and the red clamp to the positive
pole (+).
6. Connect the LPG pipe to the AIR Intake socket.
7. Select LPG and press OK
8. Select LPG INJECTION on the LPG menu and press OK
9. Fill the AIR tank and press OK. Set the sprinkling time from a minimum of 1 second to a maximum of 20 seconds and press OK
10. Set the stand-by time from a minimum of 5 seconds to a maximum of 90 seconds and press OK
11. After setting the sprinkling times, insert the sprinkler in the AIR tank to start the CALIBRATION procedure and press OK.
This operation is necessary to pressurise the machine's circuit.
12. The CALIBRATION procedure will last around one minute. At the end of this time the following screen will appear
13. Position the sprinkler adapter between the LPG filter and the injectors
14. Press OK to start the treatment
EN
I
25

Publicidad

loading