Descargar Imprimir esta página

cecotec Power Espresso 20 Barista Maestro Manual De Instrucciones página 30

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
ENGLISH
-
Make sure all parts and components are included and in good conditions. If there is any
piece missing or in bad conditions, contact the official Cecotec Technical Support Service
immediately.
-
Remove the silicone plug from the water tank, if the machine contains one, to facilitate the
water drainage.
-
Clean all detachable components.
STEP 1
Remove the packaging. Make sure that all packaging has been removed and check that you
have all the accessories.
NOTE
:
Remove the orange silicone plug at the bottom of the water tank.
STEP 2
Position the coffee machine. Make sure that the coffee machine is placed on a dry, stable, flat,
and horizontal table.
STEP 3
-
Wash and dry the parts listed below with warm water and a mild detergent:
-
Single stainless-steel coffee filter
-
Double stainless-steel coffee filter
-
Water tank
-
Filter holder
-
Coffee bean hopper
-
Coffee presser
-
Rinse and allow to air dry.
STEP 4
-
Attach the accessories.
-
Store the accessories you have purchased in the accessory storage box behind the drip
tray.
-
Place the coffee presser in the cup warming tray.
STEP 5
-
Install the coffee bean hopper.
-
Ensure that the hopper latch is aligned with the front of the hopper.
-
Push the hopper slightly downwards into the machine.
-
Turn the hopper lock clockwise to lock the hopper into place.
-
This opens the hopper door releasing the coffee beans into the grinder.
-
Fill the hopper with freshly roasted medium or dark roasted coffee beans.
58
POWER ESPRESSO 20 BARISTA MAESTRO
-
As a starting point for espresso extraction, try grind 5 or higher.
STEP 6
Preparation of the coffee machine before its first use
-
Fill up the water tank.
-
Remove the orange silicone plug from the bottom of the water tank valve.
-
Open the lid and lift it by the handle.
-
Fill the tank with cold filtered water.
-
Insert the water tank and close the lid.
NOTE
: make sure that the water tank is clean and free of debris, as any fine particles can
block the water flow.
-
Make sure that the steam and hot water knob is in the vertical OFF position.
-
Insert the plug into a 220-240 V AC socket and switch the machine on.
-
Press the power button to turn the machine on.
-
The power button will illuminate, and the grind, single espresso and double espresso
buttons will flash to indicate that the thermoblock is heating up.
NOTE
: when the hopper is installed in the correct position, the grinding button will fully
illuminate after switching on. If the hopper is installed in the wrong position, the grinding
button will flash rapidly after switching on.
NOTE
: when the power button, the grinding button, the single espresso button, and the
double espresso button are fully illuminated, the machine is ready to perform all functions or
is in READY state.
Check the power supply
-
The plug is inserted into the socket.
-
The steam and hot water knob is in the vertical OFF position.
-
Press the power button to turn the machine on.
-
The coffee machine is switched on and in READY state.
Insert the filter holder
-
Insert the single or double coffee filter into the filter holder.
-
Align the filter holder with the INSERT position to the left of the extraction head.
-
Insert the filter holder against the extraction head, slowly turn the filter holder clockwise
to the central LOCK position.
NOTE
: turning the filter holder to the central position may be difficult due to its stiffness
during the first few uses; this is normal.
ENGLISH
59
POWER ESPRESSO 20 BARISTA MAESTRO

Publicidad

loading

Este manual también es adecuado para:

01729