Connecting weighing platform A with weighing platform B
58 • seca 604, seca 495/495 r/496, seca 404/405, seca 446/448, seca 442, seca 438, seca 476
− Guardrail
(è Mounting the
seca 446
− Guardrail
(è Mounting the
seca 448
− Ramp
seca 404
on the right
1. Place weighing platform B next to weighing platform A.
A
2. Align the height of weighing platform B
vice, page 48).
3. Push weighing platform B and weighing platform A together.
4. Check to make sure weighing platform A and B have the same height (pos-
sibly using a spirit level).
CAUTION!
Danger of crushing
► Wear protective gloves when attaching connecting elements.
guardrail, page 40)
guardrail, page 40)
(è Mounting the
ramps, page 43)
B
(è Setting up and aligning the de-