Electrical Connection; Preparing And Routing The Signal And Magnet Coil Cable; Cable With Part Number D173D027U01 - ABB ProcessMaster Instrucciónes De Puesta En Marcha

Ocultar thumbs Ver también para ProcessMaster:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 177
5

Electrical connection

5.1

Preparing and routing the signal and magnet coil cable

5.1.1

Cable with part number D173D027U01

Prepare both cable ends as shown.
Important (Notice)
Use wire end sleeves.
Wire end sleeves 0.75 mm
Wire end sleeves 0.5 mm
The shields may not touch (signal short circuit).
Fig. 24: Flowmeter sensor side, dimensions in mm (inch)
Fig. 25: Transmitter side, dimensions in mm (inch)
L
maximum stripped length = 105 (4.10)
1
1 Measurement potential 3, green
2 Signal line E1, violet
3 Shield 1S
4 Shield 2S
5 Signal line, E2, blue
6 Data line, D2, yellow
CI/FEX300/FEX500-X1
2
(AWG 19), for shielding (S1, S2)
2
(AWG 20), for all other wires
L2 = 70 (2.76)
7 Data line, D1, orange
L2 = 60 (2.36)
8 Magnet coil, M2, red
L2 = 60 (2.36)
9 Magnet coil, M1, brown
L2 = 60 (2.36)
10 Groundwire, steel
L2 = 60 (2.36)
11 SE clamp
L2 = 70 (2.76)
FEX300, FEX500
Electrical connection
L2 = 70 (2.76)
L2 = 90 (3.54)
L2 = 90 (3.54)
EN - 25

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

HygienicmasterFex300Fex500

Tabla de contenido