Initial Commissioning; Removing Transportation Packaging; 37 6.2 Connecting The Service Hoses; 37 6.3 Connecting Oil Bottles - Bosch ACS 810 Manual Original

Ocultar thumbs Ver también para ACS 810:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 97
en
46 | ACS 810 | Initial commissioning
6.

Initial commissioning

6.1

Removing transportation packaging

!
On removing the outer packaging of the refrigerant
cylinder, make sure the cylinder hoses do not come
into contact with the housing or the filter dryer.
1. Remove the cardboard box.
2. Remove the ACS 810 from the packaging pallet.
3. Check delivery contents.
4. Check oil level of vacuum pump (sight glass).
i
Do not disconnect any electrical connections, and
only have internal components opened and repaired
by trained customer service personnel.
i
Contact customer service in the event of any trans-
portation damage (e.g. oil leakage).
6.2
Connecting the service hoses
Connect the service hoses included in the delivery to
the service quick-release coupling HP and LP.
!
The connected hose length is provided in the parame-
ters of the software to precisely calculate the refriger-
ant quantity. For this reason, any change to the hose
length must be entered into the software settings in
the "HOSES LENGTH" menu (see Sect. 11.3).
6.3
Connecting oil bottles
!
Do not exert excessive force when removing or
inserting the fresh oil and used oil bottles, as this
could damage the scales.
i
Pay attention to the symbols on the service flap
showing the type of bottle.
1. Fill the fresh oil bottle with compressor oil
2. Connect the fresh oil bottle to the top quick release
coupling.
3. Connect the used oil bottle to the bottom quick
release coupling.
i
ACS 810 has no weighing scales for fresh oil and
used oil. The required quantities must be read from
the bottle scale.
|
S P00 D00 006
2019-02-26
6.4

Connecting internal refrigerant cylinder

1. Connect the LP adapter to the internal refrigerant
bottle (low-pressure connection).
2. Connect the LP service hose to the adapter.
3. Set the LP valve to "O".
4. Press the <vacuum button>.
5. Enter a vacuum period of 10 minutes.
6. Open the "Vapor" valve on the internal refrigerant
bottle.
7. Confirm with <Enter>.
 The vacuum phase commences.
 The vacuum phase is completed after 10 minutes.
8. Close the blue valve and the tank valves.
9. Remove the LP service hose.
10. Disconnect ACS 810 from the mains.
11. Remove the plastic housing.
12. Have the bolt and washer provided to hand.
13. Place the internal refrigerant bottle on the refriger-
ant scales.
!
Make sure the handle of the refrigerant bottle does
not come into contact with the mount.
14. Use the bolts and washers to secure the internal
refrigerant bottle.
15. Screw the thread of the blue hose to the blue valve
using Loctite 222.
16. Screw the thread of the red hose to the red valve
using Loctite 222.
!
Take care not to damage the seals of the hoses.
17. Open the hoses and valves.
18. Re-attach the housing.
Robert Bosch GmbH

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Acs 611Acs 611-ukAcs 611-gAcs 611-icAcs 511Acs 652

Tabla de contenido