Ingersoll Rand SIERRA SL 37 Manual De Manejo Y Mantenimiento página 6

Tabla de contenido

Publicidad

U.K. PRESSURE SYSTEM REGULATIONS – FINAL IMPLEMENTATION 1 JULY 1994
COMPONENT
Pressure vessel.
Pressure gauge.
Pressure regulator.
Filters, valves and hoses.
Pressure relief valve.
High air temperature switch
and system.
Revision 01
07/97
CURRENT INFORMATION
F59 form (U.K. only)
As required, detailed
examination by local / national
legislation.
2 year – Remove and
calibrate.
6 months
2 year – Remove and
calibrate.
1 year – Function calibration
test.
REVISED INFORMATION
As required, detailed
examination by local / national
legislation.
1 year – Fully inspect all
external surfaces, welds and
fittings;
.
report any excessive
corrosion, mechanical
or impact damage.
.
report any leakage or
other deterioration.
6 year – Remove lid and any
necessary fittings.
.
Fully clean out.
.
Fully inspect all internal
surfaces and welds.
1 year – Remove and
calibrate.
1 year – Check correct
function.
COMMENT
F59 regulation ended 1 July
1994.
Change.
Not applicable to this
compressor unless for special
order.
Not applicable to this
compressor
Not applicable to this
compressor
No change (Maximum
recommended 1 year).
No change.
No change.

Publicidad

Tabla de contenido
loading

Tabla de contenido