Descargar Imprimir esta página

Bruno SRE-2010 ELITE Manual De Instalación página 11

Ocultar thumbs Ver también para SRE-2010 ELITE:

Publicidad

Idiomas disponibles

Idiomas disponibles

FINISH PREPARATION
landing
back side of rail
NO gap
SRE-2010 INSTALLATION 02-08-2019
1. Determine rail bracket placement.
2. Locate and open plastic bag marked
landing
3. Pre-assemble hardware by inserting
4. Determine rail bracket-to-rail orientation,
F
or
front side
of rail
11
PRE-INSTALLATION
See Rail Support (Rail Bracket)
Requirements on page 7 for guidlines.
Additional rail brackets may be
required for longer installations.
Rail brackets may be purchased
from Bruno.
"Stand feet hardware". These components
are used to attach rail brackets
to rail.
bolts into flat washers first and safety
washers second.
which MUST match the figures at left.
Always install rail brackets with long
nose facing the center of staircase.
NOTE: Failure to install rail brackets
in correct orientation may lead
to serious personal injury
and/or property damage!
1-
piece rail installations
s
10
skip to
tep
on next page
© BRUNO INDEPENDENT LIVING AIDS, INC.®
,
.

Publicidad

loading

Este manual también es adecuado para:

2010-i