Descargar Imprimir esta página

Bruno SRE-2010 ELITE Manual De Instalación página 15

Ocultar thumbs Ver también para SRE-2010 ELITE:

Publicidad

Idiomas disponibles

Idiomas disponibles

RAIL INSTALLATION - NON-FOLDING RAIL (continued)
SRE-2010 INSTALLATION 02-08-2019
7. Insert charge strips into rail.
Locate two (2) charge strip coils. Hold
one coil firmly to prevent uncoiling, and
carefully undo tape securing coil.
8. Using tin snips, cut a 45° bevel on end of
charge contact strips (see images at left).
NOTE: This will make it MUCH easier
to insert strip into carrier.
9. Slide beveled end of charge contact strip
into charge contact strip carrier until it
sides under lower charge contact.
10. Cut off excess charge contact strip flush
with carrier.
11. Repeat Steps 7-10 for the second charge
contact strip coil.
s
c
kip to
arriage
18.
on page
15
© BRUNO INDEPENDENT LIVING AIDS, INC.®
INSTALLATION
i
nstallation

Publicidad

loading

Este manual también es adecuado para:

2010-i