Descargar Imprimir esta página

Bruno SRE-2010 ELITE Manual De Instalación página 21

Ocultar thumbs Ver también para SRE-2010 ELITE:

Publicidad

Idiomas disponibles

Idiomas disponibles

COMPLETING RAIL INSTALLATION (continued)
SRE-2010 INSTALLATION 02-08-2019
Fig. 3
Fig. 4
Fig. 5
Fig. 6
21
INSTALLATION
3. Insert last gear rack section into upper
rail.
For folding rail installations:
Fish black charge cable up through
upper rail (see Figs. 3 and 4).
Cable wires will fit between spacer
and end of rail.
Connect charge harness to charge
contact and charger (Fig.5).
Stuff remaining harness into end of
rail (Fig. 6).
Mount provided spacer endplate
(in kit SRE-K-3050) between top of
endplate and end of rail to prevent
damage to components (Fig. 7).
See Fig. 8 for a finished endplate
example.
Fig. 7
© BRUNO INDEPENDENT LIVING AIDS, INC.®
Fig. 8

Publicidad

loading

Este manual también es adecuado para:

2010-i