Descargar Imprimir esta página

Bruno SRE-2010 ELITE Manual De Instalación página 23

Ocultar thumbs Ver también para SRE-2010 ELITE:

Publicidad

Idiomas disponibles

Idiomas disponibles

RAIL CROSS PIN INSTALLATION
SRE-2010 INSTALLATION 02-08-2019
NOTE: Install rail cross pin after jack screw
1. At bottom end of rail (base of stairs), position
SRE Cross Pin Drill Template after first tooth
of first gear rack. Template hole should be up
against the part of the extrusion covering the
gear rack (Fig. 1). Template "teeth" should fit
up against the gear rack valleys (Fig. 2).
Fig. 1
Fig. 2
2. Using a 1/8" (3.2mm) drill bit (Bruno P/N:
DRB-13001, provided with kit SRV-3000-023),
place a hole in 2 walls of the extrusion (Figs. 3
and 4). Do not drill through entire extrusion.
Fig. 3
NOTE: Drill bit will not make contact with
Fig. 4
Fig. 5
23
INSTALLATION
has been properly tightened.
gear rack (Fig. 5).
© BRUNO INDEPENDENT LIVING AIDS, INC.®

Publicidad

loading

Este manual también es adecuado para:

2010-i