SC Series Controllers
Configuration
Details about the event and when it occurred are listed.
Rundown ID:
Date:
Time:
Job:
Task:
Status:
SOC:
Job Count:
Task Count:
Tool Model:
Tool Serial:
Tool Temp:
Part ID:
Steps:
TC/AM:
Torque:
Angle:
Current:
Rate:
Deviation:
Clear: It clears all the rundowns. Press the clear interactive button a popup appears "Are you Sure?". Pres Ok to
clear all the rundowns.
Import: Imports the rundowns CSV file from the USB stick. Or import the rundowns CSV from the computer
storage using alpha tool box.
Export: Export the rundowns data into the USB stick. Or export the rundowns CSV to the computer storage
using alpha tool box.
To open trace for analysis.
● Under Analyze card Header -> Select Rundowns Card -> Select a Rundown
8.3.1.2
Analyzing traces
The Trace screen in Alpha Toolbox makes it easy to view, analyze, export for sharing, and import saved trace
files.
The selected fastening cycle graph (plot) is drawn in the window of the Trace screen. There are two X axes and
one Y axis. By default, X axis is angle and Y axis is torque. The X axis can be changed to Time parameter by
clicking on the Angle word.
Data for the trace is collected every millisecond from start to finish of the fastening cycle. Once the number of
data points exceeds ~2000 the graph is automatically scaled between event points for graph and file
manageability while ensuring a high resolution around the event points.
94 / 1032
The sequential number of the fastening cycle data
The date the fastening cycle was run.
The time the fastening cycle completed.
The active Job number in which the fastening cycle run.
The active Task number in which the fastening cycle run.
The overall status of the fastening cycle.
Shutoff Code, see relevant section for more information
The active fastener number for the Job.
The active fastener number for the Task.
The model number of the tool used during this fastening cycle.
The serial number of the tool used during this fastening cycle.
The temperature of the tool at shutoff.
The value in the Part ID buffer when the fastening cycle run.
List the steps used during the fastening cycle. The Audit step values are in
Bold
The Strategy or Smart Step used in the current step.
The Torque value achieved in the current step.
The Angle value achieved in the current step.
The Current value achieved in the current step.
The Rate value achieved in the current step (if enabled)
The Rate Deviation achieved in the current step (if enabled)