Hilti POS 15 Manual De Instrucciones página 58

Ocultar thumbs Ver también para POS 15:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

P0 is the position of the tool after setting up.
P1 is the point to be laid out and the tool is already aimed at this point.
The reflector bearer is standing close to the point (distance) calculated.
After each distance measurement the tool indicates the amount by which the reflector bearer must move, forwards or
backwards, towards the point to be laid out.
Layout corrections after distance measurements
After the distance measurement has been taken, the reflector bearer is guided with the aid of the corrections Fwd,
Back, Left, Right, Up and Down.
When measurements show that the reflector bearer is exactly on the sighting line, the Right / Left correction in the
display shows a value of 0.000 m (0.00 ft).
P0 is the position of the tool after setting up.
When measurements are taken to a reflector position not exactly in the direction of the new point, the corresponding
Fwd, Back, Left, Right corrections to the new point P1 are displayed.
Overview of the direction instructions to the layout point starting from the last measured target point
Fwd
Back
Left
Right
Return to entry of layout values.
Show and save the result.
Measure distance and update
layout corrections.
Enter the next point.
The reflector bearer must move closer to the tool by the
amount indicated.
The reflector bearer must move further away from the
tool by the amount indicated.
The reflector bearer must move further to the left, as
seen from the tool, by the amount indicated.
The reflector bearer must move further to the right, as
seen from the tool, by the amount indicated.
en
53

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pos 18

Tabla de contenido