Missing Line; The Principle Of "Missing Line - Hilti POS 15 Manual De Instrucciones

Ocultar thumbs Ver también para POS 15:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Saving data for staking out with coordinates
Pt ID
Northings (entered)
Height (entered)
Eastings (entered)
Northings (measured)
Height (measured)
Eastings (measured)
dN
dH
dE
NOTE
The procedure for as-built with coordinates is the same as for as-built based on a building control line, with the
exception that coordinates or coordinate differences are entered or shown as results instead of line or offset distances.

11.4 Missing line

11.4.1 The principle of "Missing line"

With the "Missing line" application, points anywhere within a certain space can be measured in order to determine the
horizontal distance, slope distance, height difference and slope or angle between the points.
Return to entry of layout values.
Save the layout values and last
differences.
Enter the next point.
Name of layout point.
The northings entered refer to the coordinate reference
system.
Height entered.
The eastings entered refer to the coordinate reference
system.
Measured northings refer to the coordinate reference
system.
Measured height.
Measured eastings refer to the coordinate reference
system.
Difference in northing based on the coordinate refer-
ence system. dN = delta north (measured) – delta north
(entered)
Difference in height. dH = height (measured) – height
(entered)
Difference in coordinate easting based on the coordin-
ate reference system. dE = delta east (measured) –
delta east (entered)
en
67

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pos 18

Tabla de contenido