Hilti POS 15 Manual De Instrucciones página 74

Ocultar thumbs Ver también para POS 15:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2nd method – relationship between the first and second point
Example with points on the ground / floor
Measure the first two points.
After obtaining the result, choose a new line and measure the new first point and the new second point.
Measuring to the first reference point
Measuring to the second reference point
Return to project selection.
Initiate measurement to point.
Continue to the next measure-
ment.
Return to previous view.
Measure angle and distance.
Show the resulting missing line.
en
69

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pos 18

Tabla de contenido