Descargar Imprimir esta página

Bollhoff RIVKLE NEO P107 Traduccion Del Manual De Instrucciones Originale página 49

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 131
RIVKLE
®
NEO P107 - Instruction manual
5-3 Anvil adjustment
>>> Quickstart fig. 2
PLEASE NOTE
The adjustment of the anvil is an operation that must
be carried out by qualified and trained personel.
Inappropriate adjustments risk damaging the anvil or
the blind rivet nut and potentially the application.
A
B
C
5-4 Setting force adjustment
>>> Quickstart fig. 4
PLEASE NOTE
The adjustment of the setting valve is an operation that must be carried out by qualified and trained personel.
Inappropriate adjustments risk downgrading the mechanical performances of the blind rivet nut after setting,
or may damage the tool and potentially the application.
Setting force by diameter and by material
Aluminium (+/- 10%)
Steel (+/- 10%)
Stainless steel (+/- 10%)
A4 stainless steel (+/- 10%)
Valid for Böllhoff standard catalogue fasteners, for further information, please contact a certified Böllhoff retailer.
Disconnect tool from the compressed air
1- Release the locknut (B) using a 19 mm spanner
(supplied) and unscrew it until it comes into contact
with the anvil.
2 & 3- Screw the anvil (A) + the locknut (B) until they
are in contact with the nose (C).
4A- For "open" blind rivet nuts: screw the blind rivet
nut until the end of its barrel is practically touching
the mandrel (E).
or
4A & B- For Closed blind rivet nuts: once screwed to
a stop on the mandrel (E), unscrew the closed blind
E
rivet nut by approximately 1 turn.
5- Unscrew the anvil (A) until it comes into contact
with the head of the blind rivet nut.
6- Screw the locknut (B) to 10 Nm in contact with
the nose (C) to lock the anvil position (A).
M3
3,5 kN
3,5 kN
M4
M5
3,0 kN
3,8 kN
5,5 kN
8,0 kN
5,5 kN
8,0 kN
9,5 kN
12,0 kN
EN
M6
M8
5,5 kN
10,0 kN
12,0 kN
18,0 kN
13,0 kN
15,0 kN
49

Publicidad

loading