Descargar Imprimir esta página

Bollhoff RIVKLE NEO P107 Traduccion Del Manual De Instrucciones Originale página 57

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 131
RIVKLE
®
NEO P107 - Instruction manual
Check that the setting force set on the tool is suitable for
the blind rivet nut that you want to install.(We recommend
using a RIVKLE
®
FC340 force indicator).
Check the condition of the mandrel and anvil, replace them
if needed.
Check that the operations "Screwing > Setting >
Unscrewing" are working perfectly "in air"
(without blind rivet nut).
Check that the manual unscrewing control button is working,
Check that the blind rivet nut is screwed to a stop against
the anvil.
Check that the blind rivet nut is secure on the anvil, you'll
need to gently force to unscrew the blind rivet nut manually.
Check the service pressure on the line your tool is connected
to, adjust to the pressure recommended by Böllhoff if needed.
Check the FRL which provides the tool's air supply (lubricant
flow, presence of water or impurities in the filter tank). In any
case, refer to manufacturer recommendations.
Check the oil level in the tool.
If you detect a pneumatic and/or hydraulic leak, stop using the tool immediately.
8-3 Maintenance at 250,000 cycles
We strongly recommend having the tool entirely
dismantled every 250,000 cycles by an individual
trained and qualified by a Böllhoff representative.
Dynamic components and worn or damaged sealing
elements must be replaced. It's also recommended
that you change all elements included in the repair kit.
OPERATION
FREQUENCY
• Once daily
• Each time the blind rivet nut type is changed
• After adding oil or an oil top-up
• Once daily
• For each job start
• After a drop
• After using the manual unscrewing button, or after
implementing the forced unscrewing procedure
• Once daily
• For each job start
• Each time the blind rivet nut is changed
• After using the manual unscrewing button,
or after implementing the forced unscrewing procedure
• After a drop
• After maintenance
• Each time the mandrel and anvil are changed
• Once daily
• For each job start
• After a drop
• Each time the mandrel and anvil are changed
• Once daily
• After maintenance
• After changing a traction rod, traction bushing or anvil
• After adjusting the Push-Pull adjustment bushing
• Once weekly
• After maintenance
• After changing a mandrel, traction bush or anvil
• After adjusting the Push-Pull adjustment bush
• Once weekly
• Once weekly
It is recommended that you carry out any disassembly
and reassembly operations under good cleanliness
conditions. In order to facilitate your maintenance
operations, we recommend using special tools
developed specifically for this tool to avoid any
risk of damage to the components.
EN
57

Publicidad

loading