Descargar Imprimir esta página

Bollhoff RIVKLE NEO P107 Traduccion Del Manual De Instrucciones Originale página 59

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 131
RIVKLE
®
NEO P107 - Instruction manual
8-5 Screwing activation adjustment
(Push-Pull system)
DANGER
Injury risk !
To carry out this operation, the tool must be
connected to the compressed air supply and
the nose must be removed. Make sure that you're
vigilant and focused, and respect each point of
the following instructions.
Description of operations
Tools:
3 mm pin punch
1
Screw the Push-Pull adjustment bush onto
the hydraulic piston by hand, as far as possible
without forcing.
2
Insert the mandrel into the traction bushing.
3
Screw the mandrel and traction bush assembly
onto the hydraulic piston by hand, until it comes
into contact with the adjustment bush (the
traction bush should cover the brown
O-ring of the adjustment bush).
7
4
Using a 3mm pin punch positioned in one of the
holes in the adjustment bush, gently screw the
traction & adjustment bush assembly until you
hear continuous air leakage.
5
Slowly unscrew the traction bush and adjustment
bush assembly until the air leakage stops: the
Push-Pull function is now correctly set.
EN
4
59

Publicidad

loading