SPIDER MAX 500
The central unit detected an anomaly on the PIN 5 line
Grounded line. In this
case, the pump always
rotates when the
dashboard is supplied.
White/Blue cable is
grounded across
the central unit PIN 5
and the red relay PIN 85.
Restore insulation from
ground of line 5 - 85 and
start the verification proce-
dure from the beginning.
F. 18
Check:
A) the continuity of the fair blue/gray ca-
ble across the red relay PIN 86 and the
fuse carrier no. 4 (5A).
B) continuity of the white/blue cable across
the red relay PIN 85 and the central unit
PIN 5.
All manuals and user guides at all-guides.com
(blue/white cable).
Line interrupted. The relay
cannot control the pump supply.
Install the testing wiring across the
central unit and the system.
- Lift the side stand.
- Position the key switch on the "ON" position.
- Position the emergency switch on "RUN".
Wait for more than two seconds and check
the following conditions:
PIN 5 - PIN 23 = battery low
61
Battery
voltage
(V=)
Replace the central unit.
12/04
B